Client: Lehtoniemi wastewater treatment plant
Project: Extensive renovation of wastewater treatment plant
The Lehtoniemi wastewater treatment plant underwent extensive renovation between 2013 and 2015. The renovation included the expansion of the plant’s biological treatment process, the construction of a new post-treatment unit, and the replacement of old process machinery and equipment.
We manufactured a wide range of steel structures for the project, including steel frames for the maintenance building and storage building, as well as railings and maintenance platforms for the treatment tanks. As part of the renovation, we also carried out maintenance work on the gasometer. We filled the gasometer with biogas, after which the tank was lifted and supported while the pipes were replaced.
We are proud to be involved in developing the infrastructure of the Lehtoniemi wastewater treatment plant and supporting its efficient and sustainable operation.