Client: Scantarp Oy
Project: Replacement of heating boiler chimneys
We manufactured two new heating boiler chimneys for Scantarp Oy’s Kuopio factory, which were designed to improve the factory’s flue gas removal efficiency.
During manufacturing, the height of the new chimneys was increased by a few meters to better meet current requirements. The chimneys were manufactured at our machine shop and surface-treated at our paint shop to ensure durability.
During the installation work, we removed the old chimneys and replaced them with new ones, ensuring that the work progressed smoothly and production interruptions were kept to a minimum.