Pipe bridge, Yara Suomi Oy (2025)

Kuopion Rakenneasennus > Referenssit > Projektit > Pipe bridge, Yara Suomi Oy (2025)

Customer: Yara Finland Ltd
Project: New steel structures for sulfuric acid production in 2024–2025

Yara has invested €235 million over five years in the renovation of its sulfuric acid production facility in Siilinjärvi. The aim of the project is to improve the reliability of the production process and enhance heat recovery, which will increase the plant’s energy efficiency and operational reliability.

Rakenneasennus carried out an extensive pipe bridge project, which included the design, manufacture, and installation of the pipe bridge and auxiliary structures.

We manufactured and installed steel structures such as:

  • Pipe bridge frames and supports
  • Pump bed
  • 15 painted steel pipe bridge frames

A total of 280 tons of steel was used in the project. We carried out the work in close cooperation with other parties, ensuring that the structures met high quality and safety requirements and supported the objectives of the renovation.

Putkisilta, kuva 1
Putoamissuojakypärään ja suojavaatteisiin pukeutunut työnjohtaja, teräsrakenteiden ammattilainen tarkastamassa teräsrakenteita. Kiinnostaako ura teollisuuden asennus- ja valmistustehtävissä? Katso avoimet työpaikat Rakenneasennus Oy:llä ja liity asiantuntevaan tiimiimme.
infra
WhatsApp-Kuva 2024-04-17 klo 10.59.11_31695639
Yara putkisilta kehikko kopio muoks.
IMG_7626
Putkisilta, kuva 1
Putoamissuojakypärään ja suojavaatteisiin pukeutunut työnjohtaja, teräsrakenteiden ammattilainen tarkastamassa teräsrakenteita. Kiinnostaako ura teollisuuden asennus- ja valmistustehtävissä? Katso avoimet työpaikat Rakenneasennus Oy:llä ja liity asiantuntevaan tiimiimme.
infra
WhatsApp-Kuva 2024-04-17 klo 10.59.11_31695639
Yara putkisilta kehikko kopio muoks.
IMG_7626